Here are the issues we identified with Bainbridge Green today:


The traffic study by Stantec revealed significant aesthetic, safety and traffic flow issues on Bainbridge Green.


Our design plans from Olin call for 20,000 sq ft green space created. Here is their plan:


Here is one possible scenerio to activate 3rd and Bainbridge.